lkpphiladelphia.blogg.se

Auxiliary mine ventilation manual
Auxiliary mine ventilation manual







auxiliary mine ventilation manual

Due to the production needs, the main ore pass is generally near by the main shaft and auxiliary shaft, and the collapses have created a direct threat to the stability of the nearby shafts.

Auxiliary mine ventilation manual series#

The main ore pass is affected by ore impact and long-term wear of the wall generally, there are a series of large collapses in the local areas of the main ore pass. The main ore pass as an important passage for ore transfer is critical to maintaining normal production of all mines. A numerical model and long-term monitoring of cable stress show that the plugging structure is stable and has an obvious effect on the control movement of abutment shafts. Based on the design concept to plug the main ore pass with the large collapse using artificially constructed “bite-bonded arch,” the plugging design and construction procedures are proposed.

auxiliary mine ventilation manual

The test results show that for a specific loose rock mass, the vertical diffusion distance of cement-silicate grout in the loose rock mass is a power function of grout setting time. Based on the numerical simulation of the plugging structure and the long-term stress monitoring of the cable sensors, the stability of the plugging structure itself and the control for the movement of shafts nearby are comprehensively evaluated. The relationship between the vertical diffusion distance of cement-silicate grout and setting time of grout is studied, and research results are applied to the design of plugging engineering of the main ore pass in -330 m. Aimed at the problem to plug the main ore pass with the large collapse at Xingshan Iron Mine, the viscosity-time test and the heap perfusion test of cement-silicate grout in a loose rock mass are carried out.









Auxiliary mine ventilation manual